Calculation: 77 kWh/m²/yr × 116 m² = 8,964 kWh/yr (primary energy from the BER band). Primary → delivered uses SEAI DEAP factors (fossil ~1.10, electric ~2.08). Delivered kWh then splits 85% main fuel (Electricity) + 15% electricity (lighting + ventilation always run on grid), with standing charges added. The fuel choice is the mode from this Small Area's BER records — single-property accuracy isn't guaranteed.
Iarrtar cead chun síneadh aon stóir a chur ar thaobh tig cónaithe atá ann cheana, le nasc clúdaithe, taobh-bhealach isteach, póirse chun tosaigh, síntí ar chúl, fuinneoga dormánta, fuinneog bhinne árdleibhéil, leagan amach an taobh istigh a athrú agus athoiriúnú áiléir le haghaidh seomra codhlata do chuairteoir, an bothán gairdín a leagadh, agus oibreacha láithreán agus tírdhreachúcháin a bhaineann leis ag, 4 Bruach an tSuláin, Magh Réidh, Baile Mhic Íre, Co. Chorcaí, ag Gobnait Ní Chrualaoí agus Satty O’Riordan.
Permission sought for proposed single-storey extensions to side of existing dwelling with covered link, side entrance, front porch, rear extensions, dormer windows, high level gable window, internal reconfiguration and attic conversion to provide guest room, demolition of garden shed, and all associated works and landscaping at 4, Bruach an tSuláin, Flats, Ballymakeery, Co. Cork, by Gobnait Ní Chrualaoi and Satty O’Riordan.
Single private home2025-12-23Awaiting F.I. Response 489 m
Permission for a single-storey house extension comprising the demolition of an external wall on the northeast elevation to extend the existing kitchen, along with the construction of new bedroom, office, sitting room, bathroom, storage room, new secondary access door to the front of the proposed extension and all associated site works.
Agricultural2025-05-21Conditional Permission 833 m
Permission for retention for the livestock cubicle shed and slatted slurry storage tank, change of plan and location to that granted under planning ref 14/5001 and full planning permission for the construction of the following a) milking parlour, b) open slatted slurry storage tank and cattle handing yard, c) calving shed and all associated ancillary site works and drainage services
Other2025-04-09Conditional Permission 209 m
Cead pleanála a fháil le haghaidh a) Athlonnú agus domchlá nua ar an bpáirc atá ann agus draenáil atá oiriúnach. b) Cuir isteach cosán nua, fál liontán sreinge agus tuilsoilsiú timpeall na páirce. C) Ag tógáil botháin agus binsí nua. d) Ag tógáil seastán nua. e) Dromhclá crauidh ar an gcarrclós nua. f) Soilsiú poiblí nua timpeall an suiomh ar fad agus na suíomhanna coimhdeach ag Pairc Abán, An Portach, Baile Mhic Íre, Maigh Chromtha, Co. Chorcaí. / Naomh Abán CLG is applying for Permission for; a) Relocation and resurfacing of the existing pitch, including appropriate drainage. b) New footpath, wire mesh fencing, and floodlighting around the pitch. c) Construction of new shelters and benches, d) Construction of new stand, e) Hard surfacing on the new carpark, f) New Public lighting around the entire site and associated areas at Páirc Abán, An Portach, Baile Mhic Íre, Maigh Chromtha,
Extension / Alteration2025-03-06INCOMPLETED APPLICATION209 m
Séard a bheidh sa bhfortbairt seo ná; a)Athlonnú agus Domchlá nua ar an bpáirc atá ann agus draenáil atá oirinúnach, b) Cuir insteach cosán nua, fál liontán sreinge agus tuilsoilsiú timpeall na páirce, c) Ag tógáil bothain agus binsí nua, d) Ag tógáil seastán nua, e) Dromhclá crauidh ar an gcarrclós nua, f) Soilsiú Poiblí nua timpeall an suiomh ar fad agus na suíomhanna coimhdeach ag Pairc Abán, An Portach, Baile Mhic Íre, Maigh Chromtha, Co.Chorcaí / Permission for; a) Relocation and resurfacing of the existing pitch and suitable drainage. b) Installation of a new footpath, chain link fence and floodlighting around the pitch. c) Construction of new sheds and benches. d) Construction of a new stand. e) New surface on the new car park. f) New Public Lighting around the entire site.
Small multi-unit2024-11-04CONDITIONAL437 m
Is éard atá i gceist san fhorbairt ná;
1.24 Aonaid Chónaithe a thógáil ina n-áirítear:
a.8 dteach leathscoite le 3 sheomra codlata
b.16 theach leathscoite le 4 sheomra codlata
2. Slí isteach d’fheithiclí agus coisithe a sholáthar, chomh maith le colbha íseal ar bhóthar Chluain Réidh.
3. Oibreacha draenála bréanuisce agus uisce dromchla agus gach a bhaineann leo a sholáthar, réitigh draenála inbhuanaithe agus na hoibreacha láithreáin agus na seirbhísí coimhdeacha go léir a sholáthar.
4. Soláthar spáis oscailte chomhroinnte, spás oscailte priobháideach, an suíomh a thírdhreachtú agus cóireáil teorann, soilsiú poiblí, páirceáil do chónaitheoirí agus cuairteoirí, páirceáil rothair, naisc choisithe, rothair agus feithiclí tríd na fobartha agus gach obair fobartha láithreáin ghaolmhar eile.
The development will consist of the following:
1. The construction of 24 no. residential units comprising of:
a. 8 no. 3-bed semi-detached houses
b. 16 no. 4-bed semi-detached houses
2. Provision of a new vehicle and pedestrian entrance and drop kerb from the Cluain Réidh roadway.
3. Provision of all associated surface water and foul drainage services, sustainable drainage solutions (SuDS), and all associated site works and ancillary services.
4. Provision of communal open space, private open space, site landscaping and boundary treatments, public lighting, resident and visitor car parking, bicycle parking, pedestrian, cycle, and vehicular links throughout the development, and all other associated site development works.